English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Evaluation of chronological aspects of collection and transportation of municipal solid waste (MSW) system in Urmia

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 130 | Pages: 8 ]

Title

Evaluation of chronological aspects of collection and transportation of municipal solid waste (MSW) system in Urmia

Topic: Waste Published Year: 2007
Presentation: Poster
Published in:

[ 1st Conference of Environmental Engineering ]

Original Language: English Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Evaluation of chronological aspects of collection and transportation of municipal solid waste (MSW) system in Urmia

 

Authors:
[ Ali Jalilzadeh ] - Environmental Engineering Department, Uremia University of Medical Sciences, Uremia, Iran
[ Abdorrahaim Parvaresh ] - School of Public Health, Environmental Engineering Department, Isfahan University of Medical Sciences, Isfahan, Iran

 

Abstract:

Municipal solid waste (MSW) is a serious environmental hazard and social problem in Iran. Currently a high volume of solid waste is generated every day in the district towns of Iran and unfortunately solid waste management is being deteriorated due to the limited resources to handle the increasing rate of generated waste. Due to this fact that more than 60% of solid waste management cost is usually alocated for purpose collection and transportation of generated solid waste in the city. Analysis of this section and understanding of its effect on the management system could have a great role in reduction the costs and solving many of exist problems. This study illustrate the effectiveness of timing managing an MSW economy and that has been carried out as a case study in Urmia. Results of this research illustrsate that 58.3% in Neisan, 68.7% in Khavar, 61.5% in Benz, 81.3% in Compactor and 59.3% in FAUN 0f each cycle time is pickup time.. Mean of traveling speed for Van, Mini-truck, Truck, FAUN and Compactor was 35,46,41,38 and 42 kilometer per hour respectively. Total spent time for collection and transportation of solid waste were 1:21 hour with Van, 1:23 hour with Mini-truck, 1:29 hour with Truck, 17 minutes with FAUN and 57 minutes with Compactor. Result of this study illustrated Van is the most economic vehicle for solid waste collection system in Urmia city. Generally, priority to usage of solid waste collection vehicles illustrate in below: Truck < Mini-truck < Compactor < Van < FAUN

 

Keywords:

MSW, collection, timing components, Urmia

 

CIVILICA® - © BoomSazeh Construction Technology Development Co.

SAVAFA