English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Optimization of Mining Schedule in Se-Chahun Iron Ore Deposit, Using NPVS+ and COMFAR III Softwares

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 213 | Pages: 10 ]

Title

Optimization of Mining Schedule in Se-Chahun Iron Ore Deposit, Using NPVS+ and COMFAR III Softwares

Topic: Mine Design Published Year: 2005
Presentation: Oral
Published in:

[ 2nd Iranian Open Pit Mines Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Optimization of Mining Schedule in Se-Chahun Iron Ore Deposit, Using NPVS+ and COMFAR III Softwares

 

Authors:
[ A. Shevaee ] - Project manager, Kavoshgaran Consulting Engineers
[ B. Farshadi ] - Senior engineer, Kavoshgaran Consulting Engineers
[ F. Nassaj ] - Head of computer center, Kavoshgaran Consulting Engineers

 

Abstract:

Se-Chahun Iron Ore Deposit with some 94 million tones of iron ore is planned for a production capacity of about 3.4 million ton of ore per year with 37±5% grade to be used in Chogart expansion project. In this paper, work done to define the best mining schedule to produce the required ore with the proper grade, minimizing the amount of waste to be removed, are described. This in fact makes the highest achievable Net present value (NPV) for the mine. To obtain the maximum NPV, well known NPVS+ software has been utilized. This software makes the ultimate pit by L&G algorithm and schedules mining for maximum NPV with described targets. The most effective input data to software are economical data. In contrast with the technical parameters, economical parameters are highly variable and usually change with time. Therefore a flexible economical model should be introduced. COMFAR III software has been found as a proper solution for this problem. With this software one may assign several cost centers such as: capital costs, mining costs and G&A costs to the model. With such economical model, the authors were able optimize the mining schedule of Se-Chahun iron ore deposit. The authors succeeded to decrease waste removal about 51 million tonnes in first 15 years of operation.

 

Keywords:

Final pit limit, Mining schedule, Net present value, Economical model

 