English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Final Pit Optimization and Scheduling of Gol-e-Gohar Iron Ore Mine with Whittle Software

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 252 | Pages: 9 ]

Title

Final Pit Optimization and Scheduling of Gol-e-Gohar Iron Ore Mine with Whittle Software

Topic: Production Planning Published Year: 2005
Presentation: Oral
Published in:

[ 2nd Iranian Open Pit Mines Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Final Pit Optimization and Scheduling of Gol-e-Gohar Iron Ore Mine with Whittle Software

 

Authors:
[ A. Rafizadeh ] - M.Sc. in mining engineering, Gol-e-Gohar Iron Ore Co
[ H. Akbari Javar ] - M.Sc. in Rock Mechanic engineerin, Gol-e-Gohar Iron Ore Co
[ A. Asgari ] - Mine Manager, Gol-e-Gohar Iron Ore Co.

 

Abstract:

One of the most important design stages in every mine is the final pit design. It is carried out in the feasibility stage and must be revised during the life of mine for several times due to having new geological data and changes in the economic parameters affecting the design. The initial final pit design of Gol-e-Gohar iron ore mine was done by Grangeze Company and has been the base of long term plans. The design was carried out based on the exploring data and the economic parameters were obtained by comparing with the similar mines. Now the geological data have been complemented and the real economic parameters are easy to be calculated. Therefore by using Whittle software, the updated block model involving the rock type and the grade models, the first topography prepared in the Gemcom software and economic parameters as input data to the Whittle, the final optimum pit was obtained. The results show that the final pit is a pit with 175 million tones of ore, whereas in the initial final pit there is only 138 million tones of ore. It means that there is still 47 million tones of mineble ore. In the case of selecting the optimum pit on the base of maximum NPV, a pit with 174 million tones is the final pit. Finally with some production limitations, a production scheduling was obtained.

 

Keywords:

Final pit, Optimization, Scheduling, Whittle, Gol-e-Gohar, Iron ore

 