English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Calculation and Feasibility Study of Required Trucks at Gole-e-Gohar Iron Ore Company

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 208 | Pages: 6 ]

Title

Calculation and Feasibility Study of Required Trucks at Gole-e-Gohar Iron Ore Company

Topic: Materials Handling Published Year: 2005
Presentation: Oral
Published in:

[ 2nd Iranian Open Pit Mines Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Calculation and Feasibility Study of Required Trucks at Gole-e-Gohar Iron Ore Company

 

Authors:
[ R. Ebrahimipour ] - Mining Engineer, Kusha Maadan Consulting Company, Sirjan
[ J. Afshar ] - Cheif of Feasibility Study Dept., Kusha Maadan Consulting Company

 

Abstract:

Estimation of trucks fleet size in order to increase and continue the trend of production is important and necessary. At present, the trucks fleet service time in Gole-e-Gohar Iron Ore Company is more than their actual life time and their maintenance costs increased in the recent years. The percentage of mechanical availability was 40% in the year 2004 and their efficiency decreased to an amount of 53%. In order to calculate the new trucks fleet, at first, actual cycle time was measured and then based on the five years mine plan and the tonnage for each bench, the total trucks required have been calculated. The results are shown that 13 trucks are needed with 85% of mechanical availability, ability to remove 13.5 Mt ore and waste yearly. The required investment is estimated $10.6 million. The economical studies of the project show an Internal Rate of Return (IRR) of 42% and Break Even Point of 41%.

 

Keywords:

Mechanical availability, Internal Rate of Return (IRR), Break Even Point

 