English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Economic Comparison of Surface and Underground Methods in Sechohoon Iron Ore Deposit

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 102 | Pages: 10 ]

Title

Economic Comparison of Surface and Underground Methods in Sechohoon Iron Ore Deposit

Topic: Management & Economy Published Year: 2005
Presentation: Oral
Published in:

[ 2nd Iranian Open Pit Mines Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Economic Comparison of Surface and Underground Methods in Sechohoon Iron Ore Deposit

 

Authors:
[ S. K. Oure'ee ] - Assistant professor of Engineering Faculty, Mining Engineering Dept., Tarbiat modarres University
[ A. Chaman ara ] - Mining Engineering Dept. MS.c

 

Abstract:

In this research the Open pit method for the north & south masses as well as the Sublevel caving method for the north mass were evaluated technically & economically. After calculating the primary capital investment & operating costs for the next years, the cash flow was build up by employing the depreciation costs and tax. In the Open pit plan the pay back period calculated as 3 yr, & 5 month, Also the NPV and rate of return determined, without tax, 151 milliards and 28%, with tax, 110 milliards and 26% respectively. In the underground plan, the results of calculation were 3yr, 11 month for the pay back period, 169 milliards for NPV and 32% for IRR, without implementation of tax and with tax the NPV and IRR were 105 milliards, 29% respectively. Although both projects were feasible, the underground plan came up with NPV and IRR greater than the Surface project. Consequently the underground plan was realized more economical than the other one.

 

Keywords:

Sechohoon Iron Ore, Sublevel caving method, Underground mining

 