English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Study of Effective Factors on Decrease of Over Excavation of Tunnels in Blasting and Excavation Method

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 66 | Pages: 8 ]

Title

Study of Effective Factors on Decrease of Over Excavation of Tunnels in Blasting and Excavation Method

Topic: Project Management, Contracts and Construction Technlogy Published Year: 2001
Presentation: Oral
Published in:

[ 5th Iranian Tunneling Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Study of Effective Factors on Decrease of Over Excavation of Tunnels in Blasting and Excavation Method

 

Author:
[ RAMIN BAHMANI ] - Master Student of Mine Extraction, Master of SAHEL engineering company

 

Abstract:

Inclination of people to different basing excavation is the reason that the researchers had many studies on these spaces. Tunnel construction methods can be divided in to 2 different methods; excavation and blasting, mechanical excavation. Choosing each of them is depending on the place that we construct the project there, but the first method is using more because of its low costs and flexibility of that. In this paper attempted to motion the results of first method in the construction of the project. In this project we considered factors like low small slope of field, minimum thickness of layering in the zone and application of numerous joints in blocks fall potential on shell and walls of tunnels that it can be provide more gaps on the shells. In the first because of do not having enough attention on the using the excavation and blasting method look like the choosing the good way and using the PISHAHANG tunnel there was more excavation about 20 to 30 percentage that do tunnel be instability but with considered the above factors it be controlled the length of tunnel about 5 to 10 percentage, and was the reason of frugality in the time and expensive of project.

 

Keywords:

tunnel, excavation and blasting, over excavation, controlled blasting

 

CIVILICA® - © BoomSazeh Construction Technology Development Co.

SAVAFA