English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Estimate of drill and blast rock tunnel advance , primary support shotcrete , wiremesh and bolting costs

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 201 | Pages: 10 ]

Title

Estimate of drill and blast rock tunnel advance , primary support shotcrete , wiremesh and bolting costs

Topic: Project Management, Contracts and Construction Technlogy Published Year: 2001
Presentation: Oral
Published in:

[ 5th Iranian Tunneling Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Estimate of drill and blast rock tunnel advance , primary support shotcrete , wiremesh and bolting costs

 

Author:
[ Hmid Reza Alizadeh ] - MS.c. of Mine Engineering - Hara Institute. Tehran , Iran

 

Abstract:

Still don’t get suitable calculate and value costs of programe and budget organize for determine drill and blast rock tunnel and primary support and it is high differ between planning – budget organization costs and real value. For example on the base of B.O.Q of road, bund and runway, cost of drill and blast tunnel advance for one cubic meter in the hard rock 45,000 Rial. But on the base of real culculate this value is equal 240.000 Rial. So cost of one cubic meter shotcrete (thickness 5 centimeter) on the base of that refrence is 288.000 Rial but on the base of real time that is over 800.000 Rial. This high differ between costs create problems in the operative of civil activity. In this paper on the base of real calculate of activities projects (case study) results of cost analysis drill and blast tunnel advance for one cubic meter , one cubic meter of shotcrete , one square meter of wiremeshing and one meter of bolting showing. In this paper try attention to all parameter effective on the calculation until results more real.

 

Keywords:

Cost estimate, Drilling, Shotcrete, Wire meshing, Rock Bolting

 

CIVILICA® - © BoomSazeh Construction Technology Development Co.

SAVAFA