English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Available problems in construct of the pressure reservoirs in GHATOOND OLIYA POWER PLANT

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 83 | Pages: 12 ]

Title

Available problems in construct of the pressure reservoirs in GHATOOND OLIYA POWER PLANT

Topic: Management and Construction Technology Published Year: 2004
Presentation: Oral
Published in:

[ 6th Iranian Tunneling Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Available problems in construct of the pressure reservoirs in GHATOOND OLIYA POWER PLANT

 

Author:
[ REZA GHAFAR ZADEH ] - SEPASAD Engineering Company, dam workshop of GHATOOND OLIYA

 

Abstract:

GHATOOND OLIYA Hydroelectric plant is constructed in KHOOZESTAN STATE. In water supply system of this hydroelectric power plant they estimate 2 pressure reservoirs as vertical shafts. There are many problems because of their big sections and small width between of it’s wall that most be considered. Because of this they dose perfect surveying on this method with comparing the results with the available results of SPAIN ALDIDAVIA project and they could estimate some available problems and could find best ways in front of them and try to be ended the excavation operation of them in 18 month. There are some ways in front of the problems that they is consists of: define of minimum diameter for pilot shaft, excavation of reservoirs in 3 part, construction the concrete on upset of them, estimating the good instrumentation program.

 

Keywords:

 

CIVILICA® - © BoomSazeh Construction Technology Development Co.

SAVAFA