English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Surveying the special soil settlements in the effect of shallow tunnels

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 85 | Pages: 14 ]

Title

Surveying the special soil settlements in the effect of shallow tunnels

Topic: Cave-in, Settlement and ditching Published Year: 2004
Presentation: Oral
Published in:

[ 6th Iranian Tunneling Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Surveying the special soil settlements in the effect of shallow tunnels

 

Authors:
[ SHADI JAFAR PISHEH ] - engineering college of ESFAHAN university
[ MAHMOOD VAFAYIAN ] - engineering college of ESFAHAN university

 

Abstract:

This paper explains the matter of soil monitoring in the effect of shallow tunnels. With looking at the results that find from constructed projects we could see the importance of the problem. Then came the results of PLAXIS software, This accounts studies the effect of many factors on settlement for tunnel without cover and are construct with comparing the 2 results. Fortunately results of accounts and the results of experimental measuring are look like each other. Because of this can be sure from the results of timing settlement results, and in the condition that the soil properties are not same with making use of the suitable software that show the condition of the settlement can compare them with each other. In the end rate of the end settlement to the other are given for many condition like dept of tunnel, width of tunnel, kind of soil. Numbers that find from this accounting can use as a maximum limit of settlement when excavation the tunnel.

 

Keywords:

 

CIVILICA® - © BoomSazeh Construction Technology Development Co.

SAVAFA