English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Thrust estimation in small diameter tunnel excavation using slurry pipe-jacking method

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 168 | Pages: 12 ]

Title

Thrust estimation in small diameter tunnel excavation using slurry pipe-jacking method

Topic: Management and Construction Technology Published Year: 2004
Presentation: Oral
Published in:

[ 6th Iranian Tunneling Conference ]

Original Language: English Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Thrust estimation in small diameter tunnel excavation using slurry pipe-jacking method

 

Authors:
[ Hideki SHIMADA ] - Associate Professor, Department of Earth Resources and Mining Engineering
[ Saeid KHAZAEI ] - Ph. D. Student, Department of Earth Resources and Mining Engineering
[ Kikuo MATSUI ] - Professor, Department of Earth Resources and Mining Engineering

 

Abstract:

In order to protect the safety of workers during construction, as well as for environmental and cost reasons, small-diameter shallow tunneling methods have recently become increasingly important in regards to outside plant such as for supplying of water, electricity, telecommunications and gas. The effects of the above projects in overcrowded urban areas are significant and often result in substantial impact in traffic delays associated with a loss of travel time. The solution of these utility placement problems, if the full impact of trench excavation is avoided, is trenchless technology. In particular, for construction work near existing facilities, underground tunnels that are excavated by slurry pipe-jacking are increasingly employed in order to avoid problems. Slurry pipe-jacking was firmly established as a special method for the non-disruptive construction of the underground pipelines of sewage systems. Pipe-jacking, in its traditional form, has occasionally been used for short railways, roads, rivers, and other projects. Basically the system involves the pushing or thrusting concrete pipes into the ground by a number of jacks. This method utilizes mud slurry that is formed around the pipes in order to stabilize the surrounding soil. In slurry pipe-jacking, the performance of the mud slurry plays an important role in the pushing process. Thrust in slurry pipe-jacking can be predicted by evaluating the resistance between the mud slurry and the concrete pipes and the resistance between the soil and the pipes in linear and curved jacking area. This paper discussed about this point.

 