English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Estimating of internal water flaw to tunnel with making use of the water pressure tests

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 104 | Pages: 13 ]

Title

Estimating of internal water flaw to tunnel with making use of the water pressure tests

Topic: Geological and Geotechnical surveys and Behaviour Parameters Published Year: 2004
Presentation: Oral
Published in:

[ 6th Iranian Tunneling Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Estimating of internal water flaw to tunnel with making use of the water pressure tests

 

Author:
[ JAFAR HASAN POOR ] - TARBIAT MODARRSS STUDENT OF TEHRAN

 

Abstract:

Water flaw is one of the problems in tunnel projects that can have many hazards on the plane and have effect on tunnel operations. In this way it must be estimated the place and the amount of water flaw to inside the tunnel and is considered in the tunneling. Passed experience show that is not easy the estimating the appointment of all effective factors on water flaw. This paper explain a way for estimating seepage the water inside the tunnel. In this method long term steady state inflow and the amount of external water from the front of the tunnel that are flawed in first parts of excavation. In this method important problem is appointment of seepage factor of rock mass that distribution of it’s amount are estimated with the results of water pressure tests. As an actived example this is used in GHAMROOD project and the amount of seepage the water in -------- units of tunnel way that are considered of shoil slit and FILT and SHIST. Results of this method show that many parts of units without GHONHA and fault will have not big problems in the amount of internal water.

 

Keywords:

 

CIVILICA® - © BoomSazeh Construction Technology Development Co.

SAVAFA