English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Assessment the results of monitoring of basement chisels in MASJED SOLEYMAN dam

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 126 | Pages: 13 ]

Title

Assessment the results of monitoring of basement chisels in MASJED SOLEYMAN dam

Topic: Instrumentation Published Year: 2004
Presentation: Oral
Published in:

[ 6th Iranian Tunneling Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Assessment the results of monitoring of basement chisels in MASJED SOLEYMAN dam

 

Authors:
[ MOSTAFA PASHA NEJATI ] - PAYAB ZAMZAM company MS
[ BABAK ELAHIYAN ] - PAYAB ZAMZAM company MS
[ MEHDI MOOSAVI ] - professor assistance of engineering college of Tehran university
[ AHMAD JAFARI ] - professor assistance of engineering college of Tehran university

 

Abstract:

MASJED SOLEYMAN dam power plant is construct on KAROON river in 2 section: developed plan and one phase, This power plant are on the sedimentary rocks from the BAKHTIYARI structures. The big dimension of the chisel of power plant with it’s 3 dimensional geometry are need to perfect monitoring on that. With erecting about 200 equipment and registering the need information in the 4 years of constructing the tunnel the monitoring the rock mass are registered. As a registered monitoring of chisel the primary plane are changed that the quality of each section are registered with the erecting the equipment. In this moment the excavation of chisel are ended and displacement of rock mass are stability, this paper give the results of this operation.

 

Keywords:

 

CIVILICA® - © BoomSazeh Construction Technology Development Co.

SAVAFA