English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Propping plane of water transferring tunnel on GHATOOND dam power plant

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 106 | Pages: 8 ]

Title

Propping plane of water transferring tunnel on GHATOOND dam power plant

Topic: Design and Analysis of Retaining Systems Published Year: 2004
Presentation: Oral
Published in:

[ 6th Iranian Tunneling Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Propping plane of water transferring tunnel on GHATOOND dam power plant

 

Authors:
[ ALI MORADZADEH ] - MINE ENGINEERING PROFFESSOR ASSISTANCE OF SHAHROOD UNIVERSITY
[ MORTAZA GHAROONI NIK ] - professor assistance of university of since and technology, researching center of road and communication organization
[ REZA SHAKOOR SHAHABI ] - SEPASAD engineering company
[ ABOLGHASEM MOZAFARI SHAMS ] - SEPASAD engineering group in TEHRAN

 

Abstract:

The kind of GHATOOND DAM is rock fill with clayey core that with capacity of 1000 MW are constructed on KAROON dam. Water intake system of power plant with up and down water transfer tunnel are under pressure well and buffer bowser and propping of them that are the instruments of dams are important. Aim of this research is analysis the water transferring stability and estimating the propping of them in the time of excavation of these structures. Rock mass of the left of structures are assessment with the famous methods of rock engineering and estimating of propping. The propping system of experimental method is surveyed with the propping curve of the earth and the primary cover are gave for them. After that with using the UDEC software the numerical analysis of tunnel section are done. And propping system with the bolt with the length of 3 meter with distance of 2.5)2.5 and shot create with The width the 10 cm are gave.

 