English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers of civil engineering published in Iranian national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: +98-21-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of The way of choosing and providing the engineering properties of the excavation machine that used for excavating the tunnel in the water transfer tunnel of GHALAMROOD in 3 and 4 sections of that

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 93 | Pages: 12 ]

Title

The way of choosing and providing the engineering properties of the excavation machine that used for excavating the tunnel in the water transfer tunnel of GHALAMROOD in 3 and 4 sections of that

Topic: Management and Construction Technology Published Year: 2004
Presentation: Oral
Published in:

[ 6th Iranian Tunneling Conference ]

Original Language: Persian Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format The way of choosing and providing the engineering properties of the excavation machine that used for excavating the tunnel in the water transfer tunnel of GHALAMROOD in 3 and 4 sections of that

 

Authors:
[ MOHAMMAD HOSSEIN MIVECHI ] - EMAM HOSSEIN university member AMIR HAJI ZADEH
[ HAMED MOAMERI ATAR ABAD ] -

 

Abstract:

Water transfer tunnel of GHAMROOD has these information: length is 35750, angle is .13 percentage for transferring the 23 meter ^3water in 1 second from DEZ to GHAMROOD, and constructing operation of that are started since 1381. Constructing and designing the 3 and 4 section of this tunnel with the length of 18 km are gave to KHATAMOLANBIA organization. With looking at the maximum length of the tunnel and 5 years limitation in constructing that and with the week methods in tunneling they must use mechanical methods in excavation the tunnel. With looking at the geology condition and the way of tunnel the machine for excavating the tunnel with 17400 meter from 17700 meter are choose and the engineering way of that with making use the help of foreign and internal engineers are choose. And after that the buying of this machine done. In this paper with giving he engineering information in choosing the need machine the way of providing the engineering information and choosing the best structure are explained.

 

Keywords:

 

CIVILICA® - © BoomSazeh Construction Technology Development Co.

SAVAFA