English Version is Trial!

کاربران فارسی زبان لطفا به بخش فارسی مراجعه نمایند.

سیویلیکا به زبان فارسی

Advanced Search

Title
Author
(Last name)
Abstract
Keywords

About CIVILICA®

CIVILICA® provides professional papers published in national and international conferences.

This site is registered for BoomSazeh Construction Technology Development Co.

 

Contact Us:

Tel: 021-88008044

Email: Info [at]  CIVILICA [dot] com

 

 
Home Page E-mail us to: Info @ CIVILICA . com Tel: +98-21-88008044

ISSN 1735-5540   

 

Quick Search in Title, Abstract, and Keywords of Papers

Showing Abstract of Hydro Generators Refurbishment of Shahied Abbaspour HPP

 
Links

[ Bug Reporting | Back | See this Article in Persian CIVILICA ]

Paper Details

[ Downloads: 0 | Abstract Viewed: 450 | Pages: 5 ]

Title

Hydro Generators Refurbishment of Shahied Abbaspour HPP

Topic: mechanical equipment Published Year: 1390
Presentation:
Published in:

[ 1st International and 3rd National Conference on Dams and hydropower ]

Original Language: English Full Text Size: Not Available

 

Abstract of the Article

 

Note: English CIVILICA is in its Trial Period so Full Texts can not be provided! Persian users can download it here

Download This article in PDF format Hydro Generators Refurbishment of Shahied Abbaspour HPP

 

Author:

[ Mohammad. S. Eslamipour ] -

 

Abstract:

Refurbishment of hydro generator will be implemented by a consecutive renewal of individual component within schedule assuring minimal disruption in operation of generator. Duringrefurbishment, several objectives have to be considered such as: •Increasing efficiency •Elimination of unsteady effects•Prolonging life scale •Increased Generator availability, reliability and safety •Increased revenues from peak power generation •Reduced service and maintenance costsDecision making for plant refurbishment is a very complex task requiring the assessment of the condition of existing plant components and the evaluation of the cost versus generation capabilitysituation. A total replacement of worn or damaged generator components is far beyond theallowable cost for repair. Several circumstances have to be investigated and arbitration between the different options has to be made.In this paper discuss the method for determining generator up grading potentials

 

Keywords:

Hydro Generator, refurbishment, Cost, HPP

 

CIVILICA® - © BoomSazeh Construction Technology Development Co.

SAVAFA