Study of Execution Mechanism and Partnership structure of parties involved in investment projects (A case study of a major power plant company

سال انتشار: 1392
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,128

فایل این مقاله در 21 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

FNCAM01_492

تاریخ نمایه سازی: 28 آذر 1392

چکیده مقاله:

The aim of this study is investigating the execution mechanism and structure of related parties involved in investment projects. Opting for a qualitative research methodology, we gathered the data using interviews complimented by library research. Initially, the necessity of private sector involvement in the construction of infrastructure projects to achieve Iran's 20-year vision plan is elaborated on; then, the fundamentals of investment projects and programs are approached from various aspects. After that, we introduce Farab Company along with both its under-constructing and its completed Engineering Procurement Construction (EPC) projects. The reasons its project type has changed from EPC to investment projects are listed/discussed; plus, its current Build Operate Transfer (BOT) projects is introduced. To understand the company’s execution process of investment project, its organizational structure and parties are scrutinized. Finally, the stages in the execution of investment projects as well as the role of subsidiary companies of Farab in each stage, from beginning to end, are detailed. Findings of this study can present project-based companies with a special structure and mechanism for execution process of investment projects. We conclude that the pattern adapted in Farab Company can be utilized by investment projects professionals in their corporate and / or organizations

کلیدواژه ها:

construction operation transfer (BOT) ، Iran Farab company ، public private partnership(PPP). investment projects

نویسندگان

Y Goldust Jouybari

PHD student of construction and project management, Tarbiat Modares university

M.H. Sobhiyah

Assistant professor of construction and project management, Tarbiat Modares university

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Chao-Chung Kang, Cheng-Min Feng, Chiu-Yen Kuo. (2012). Comparison of royalty ...
  • Finnerty, J.D., (1996). Project Financing: Asset-Based Financial Engineering. John Wiley ...
  • Walker, C., Smith, A.J., (1996). Privatized Infrastructure The Build Operate ...
  • Public Construction Commissio. (2001). Report of Financial Planning of the ...
  • Mostafa Khanzadi, Farnad Nasirzadeh, Majid Alipour. (March 2012) Integrating system ...
  • L.Y. Shen, Y.Z. Wu.(2005) Risk concession model for build operate ...
  • I M. Khanzadi, F. Nasirzadeh, M. Alipour.(2010) Using Fuzzy-Delphi technique ...
  • Fen-May Liou, Chih-Pin Huang.(2008). Automated approach to negotiations of BOT ...
  • Emmanuelle Auriol, Pierre M. Pic ard(October 2011), A theory of ...
  • Kha _ i-Safashahr Internationat Institute for Research & Education September ...
  • Zarabadipour, Saeed., Zargarpour, Hamid, .(2008). risk analysis in investmen projects. ...
  • Keshtiban, Yaser, .(2008). The study of the application of public ...
  • Energy ministry of Iran, . (2005). Performance records ...
  • Chao-Chung Kang, Cheng-Min Feng, Chiu-Yen Kuo, . (November 2011). A ...
  • C. Walker, A.J. Smith, .(1996) Privatized Infrastructure The Build Operate ...
  • C.C. Kang, C.M. Feng, A.Khan. Haider, . (2005) Risk assessment ...
  • M.M. Kumaraswamy _ D.A. Morris, . (2002) B uild- operate-tran ...
  • Ahmadi, L. (2006). A study of an appropriate BOT model ...
  • Bayat.. S.T, . (2007). Application of BOT delivery method in ...
  • United Nations, . (1997). Assessment of Privatization of The Electric ...
  • _ _ _ plant projects ...
  • Tavasoli Jahromi, M, . (2002). International contract of BOT. Law ...
  • Sadeghi, M, . (2006). A study of BOT international contract ...
  • Shiravi, A., (2001). The reasons of using BOT contrace and ...
  • Tiglo, (1992) Operate -Transfer Schemes, Far Eastern Review.57 ...
  • Jeffrey, Huang.. and Rick, Huijbregts. (1999). Information Technology for project ...
  • Shekarchi, S., and Taheri, Robin. (2009). Utilizing BOT method in ...
  • Kha _ i-Safashahr Internationat Institute for Research & Education September ...
  • Taheri, Robin., (2000). Utilizing BOT method in development of Iran ...
  • Hoseyni, S.M., and Barati, H. and Foroozbakhsh, F., (2010). Participation ...
  • نمایش کامل مراجع