Analysis of Delay Causes in Mass-Housing Projects in Iran

سال انتشار: 1394
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 979

فایل این مقاله در 8 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

ICCE10_1016

تاریخ نمایه سازی: 19 تیر 1394

چکیده مقاله:

Activities in a project confront with time extensions and delays which are also important and usual in the building construction which in result have some disadvantages in different aspects. Studies have been done to explore the most leading and effective causes of delay. The aim of this paper is to identify the delay causes on mass-housing projects completion. A questionnaire survey was performed to extract the delay causes by conducting 117 structured questionnaires on 60 mass-housing projects. This study identified 6 most important categories of delay causes from 16 subcategories and total 42 delay causes. The main categories are: (1) environment, (2) resource, (3) project procurement, (4) project participants, (5) management, and (6) failure. After data analysis the findings showed that labor productivity, on time and accurate design, client interference and financial condition are the most important delay causes on mass-housing projects

نویسندگان

Forough Kaviani

M.S.c Student, dept. of civil engineering, Tabari Institute, Sardaran Ave., Babol, Mazandaran, Iran

Amir Yahyapour

Postgraduate Student, School of Civil Engineering, College of Engineering, University of Tehran, ۱۶ Azar Ave., Tehran, Iran.

Saber Shiripour

Ph.D Student, Department of Industrial Engineering, Razi University, Kermanshah, Iran.

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • S. A. Assaf and S. Al-Hlejji, "Causes of delay in ...
  • James G. Zack, "Schedule delay analysis; is there agreement?, ; ...
  • S. S. S. Gardezi, I. A. Manarvi, and S. J. ...
  • D. Arditi, G. T. Akan, and S. Gurdamar, "Reasos for ...
  • S. A. Assaf, M. Al-Khalil, and M. Al-Hazmi, "Causes of ...
  • M. E. Abd El-Razek, H. A. Bassioni, and A. M. ...
  • N. Mansfield, O. Ugwu, and T. Doran, "Causes of delay ...
  • D. C. Okpala and A. N. Aniekwu, "Causes of High ...
  • H. Odeyinka and A. A. Oladapo, "The causes and effects ...
  • H. Doloi, A. Sawhney, K. C. Iyer, and S. Rentala, ...
  • P. A. Koushki, K. A1- Rashid, and N. Kartam, "Delays ...
  • M. Sambasivan and Y. W. Soon, "Causes and effects of ...
  • D. W. Chan and M. M. Kumaraswamy, "A comparative study ...
  • S. Hemmati and M .M.zolfaghari, "Identifying the most effective causes ...
  • A. Gh.R., T. amiri M.J, H. N. M, and M. ...
  • N. Hamzah, M. _ Khoiry, I. Arshad, N. M. Tawil, ...
  • J.-B. Yang and C.-K. Kao, "Critical path effect based delay ...
  • I. E. Allen and . A. Seaman, "Likert Scales and ...
  • R. Chomeya, "Quality of Psychology Test Betwee Likert Scale 5 ...
  • D. George and P. Mallery, SPSS for Windows Step by ...
  • J. K. Yates and S Guhathakurta, "International labor productivity, " ...
  • A. M. Jarkas and C. G. Bitar, "Factors Affecting Construction ...
  • A. A. Aibinu and H A. Odeyinka, "Construction Delays and ...
  • R. F. Aziz, "Ranking of delay factors in construction projects ...
  • M. M. Marzouk and T I. El-Rasas, "Analyzing delay causes ...
  • T. Y. Lo, I. W. Fung, and K. C. Tung, ...
  • M. Gindiz, Y. Nielsen, and M. 6demir, "Quantification of Delay ...
  • W. G. Cochran, Sampling techniques. Wiley, 1977, p. 428. ...
  • J. C. Nunnally, Psychometric theory. McGraw-Hill, 1978, p. 701. ...
  • نمایش کامل مراجع