The Effects of Delay Due to Lot Size in a Shop with Assembled Products

سال انتشار: 1383
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 2,040

فایل این مقاله در 9 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IIEC03_009

تاریخ نمایه سازی: 10 مهر 1385

چکیده مقاله:

Master production schedule (MPS) and material requirements planning (MRP) are used for production planning. The objective of this study is to determine the proper lot size in order to increase delivery performance by adjusting priority delay, processing delay, staging delay and requirements delay. The approach used in this paper, is to present the multi-product production planning problem with a bill of materials (BOM) as a network. This representation helps in calculating various delays. Further, the impact of change of lot size on the adjustment of the delays can be easily evaluated using the network and the Gantt chart prepared from the network.

نویسندگان

Iraj Mahdavi

Mazandaran University of Science & Technology, Babol, Iran

Morteza Bagherpour

Mazandaran University of Science & Technology, Babol, Iran

S.Majid Ebrahimi

Mazandaran University of Science & Technology, Babol, Iran

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • ENNS, S.T., (2001), MRP Performance effects due to lot size ...
  • FIELDES R and KINGSMAN B., (1997), Demand uncertainty and lot ...
  • K ARM ARKAR, U. S., (1987), Lot sizes, lead times ...
  • MOLINDER, A. , (1 997), Joint optimization of lot sizes, ...
  • نمایش کامل مراجع