FUZZY LEAD TIME APPLICATION TO MATERIAL REQUIREMENT PLANNING
محل انتشار: چهارمین کنفرانس ملی مهندسی صنایع
سال انتشار: 1384
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 2,207
فایل این مقاله در 5 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC04_163
تاریخ نمایه سازی: 7 مهر 1385
چکیده مقاله:
Material requirement planning (MRP) is used as important technique into production planning topics and several researches have done around it, but in the case of fuzzy lead time there are few researches available in the literature.
In this paper fuzzy lead-time is discussed to cover uncertainty condition in MRP systems. Hereby, history of vendor delivery and volume of order are considered as inputs, and lead-time is defined as out put of the proposed fuzzy system. Finally, based on some linguistic rules (that are logical relationship between inputs and output) and generating fuzzy rule base, lead- time is estimated. The numerical example is given to
demonstrate superiority of the designed proposed system.
کلیدواژه ها:
نویسندگان
Morteza Bagherpour
Industrial Engineering department, Shiraz Azad Islamic University, Shiraz, Iran
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :