Lot Sizing and Lead Time Quotation in a Two-Level Assembly System

سال انتشار: 1386
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,679

فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد

این مقاله در بخشهای موضوعی زیر دسته بندی شده است:

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IIEC05_081

تاریخ نمایه سازی: 22 آبان 1385

چکیده مقاله:

In this paper a simultaneous Lead Time quotation and lot sizing problem in an assembly system is investigated. The researchers address a production system with a product that has deterministic demand over a T-Period planning horizon and is produced in lots because of the economy of scale. If a lot is completed before the demand period, inventory carrying cost is incurred. On shortages, a lead time is quoted to customers and a lead time quotation cost is incurred and finally if the order is delivered later than its due date period, tardiness cost is charged. The components supply lead time is stochastic which follows a discrete distribution. The problem is to decide on lot sizes of product and components, supply and production starting periods and due date of lots (to be quoted to customers) so that relevant costs are minimized. The objective function is the sum of production, inventory carrying, lead time quotation, and tardiness costs. Then they develop a genetic algorithm to solve the proposed model. Experimental framework is set up to test the efficiency of the proposed method, which turns out to rate high both in terms of cost effectiveness and execution speed.

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Bahl, H.C., Ritzman, L.P., Gupta J.N.D., 1987. Determining Lot Sizes ...
  • Berretta, R., Rodrigues, L.F., 2004. A remetic algorithm jfor a ...
  • Bertrand, J.W.M., Ooijen, H.P.G.V., 2000. Customer order lead tires for ...
  • Bragg, D.J., Duplaga, E.A., Watis, C.A., 1999. The effects of ...
  • Brahimi, N., Dauzere-Pere S _ S., Najid, N.M., Nordli, A., ...
  • Cheng, T.C.E., Gupta, M.C., 1989. Survey of scheduling research inuvolving ...
  • Cheng, T.C.E., Kovalyov, M.Y., 1996. Batch scheduling and common due-date ...
  • Clark, A.R., Armentano, V.A., 1995. A Heuristic jfor a Resource- ...
  • Dolgui, A., Ould-Louly, M.A., 2002. A model for supply planning ...
  • Dellaert, N., Jeunet, J., 2003. Randomized multi-level lot-sizing heuristics for ...
  • Dellaert, N., Jeunet, J., 2005. _ alternative to safety stock ...
  • Dellaert, N., Jeunet, J., Jonard, N., 2000. A genetic algorithm ...
  • Duenyas, I., 1995, Single jfacility due date setting with multiple ...
  • Goldberg, D.E., 1989. Genetic algorithms in search, Optimization, and machine ...
  • Gordon, V., Proth, J.M., Chu, C., 2002. A survey of ...
  • Gupta, S.M., Brennan, L., 1995. MRP systems under supply and ...
  • Hadley, G., Whitin, T.M., 1962. A family of dynamic inventory ...
  • Hertz, A., Widmer, M., 2003. Guidelines for the use of ...
  • Jans, R., Degraeve, Z., 2007. Meta-heu ristics for dynamic lot ...
  • Karimi, B., Fatemi Ghomi, S.M.T., Wilson J.M., 2003. The capacitated ...
  • Krarup, J., Bilde, O., 1977. Plant location, set covering and ...
  • Liberatore, M.J., 1977. Planning horizons for a stochastic lead time ...
  • Michalewicz, Z., 1992. Genetic algorithms + Data structures _ Evolution ...
  • Ooijen, H.P.G.V., Bertrand, J.W.M., 2001. Economic due-date setting in job-shops ...
  • Ould-Louly, M. A., Dolgui A., 2004. The MPS pa rarnete ...
  • Potts, C.N., Kovalyov, M.Y., 2000. Scheduling with batching: A review, ...
  • Sabuncuoglu, I., Comlekci , A., 2002. Ope ration-based flowtime estiration ...
  • Shabtay D., Steiner G., 2006. Tvwo due date assignment problems ...
  • Slotnick, S.A., Sobel, M. J., 2005. Manufactu ring lead-time rules: ...
  • Song, D.P., Hicks, C., Earl, C.F., 2002. Product due date ...
  • Sox, C.R., Jackson, P.L., Bowman, A., Muckstadt, J.A., 1999. A ...
  • Veral, E.A., Mohan, R.P., 1999. A two-phased approach to setting ...
  • Veral, E.A., 2001. Computer sirmulation of due-date setting in multi-machine ...
  • Wagner, H.M., Whitin, T.M., 1958. Dynamic version of the economic ...
  • _ 1991. _ Sequencing in a Muliclass M/G/ _ Vol. ...
  • Xia Y., Chen B., Yue, J., 2007. Job sequencing and ...
  • Zangwill W.I., 1966. A Deterministic Multi-Period Production Scheduling Model with ...
  • نمایش کامل مراجع