Two-Sided Assembly Line Balancing with Considering the Relationships between the Tasks
محل انتشار: هشتمین کنفرانس بین المللی مهندسی صنایع
سال انتشار: 1391
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,400
فایل این مقاله در 7 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
IIEC08_048
تاریخ نمایه سازی: 7 آذر 1391
چکیده مقاله:
In the most last researches about the balancing of twosided assembly lines, it is assumed that the relationship between each two tasks assignable to a side of the line is equal. However inpractice, this relationship may be related to the factors such as the distance between the implementation place of the tasks and thetools required for performing them. We know that the more relationship between the tasks assigned to each station can obtainmore efficiency for the assembly line. So first, we suggest an index for calculating the value of the relationship between each twotasks and then we define a performance criterion called assembly line tasks consistency for calculating the average relationshipbetween the tasks assigned to the stations of each solution. Wepropose a simulated annealing algorithm for solving the two-sided assembly line balancing problem with considering the threeperformance criteria, simultaneously: number of stations or line efficiency, number of mate-stations or line length and assembly line tasks consistency.
کلیدواژه ها:
نویسندگان