A SA algorithm for eost oriented RACP with diserete time resource tradeoff

سال انتشار: 1390
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 751

فایل این مقاله در 16 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IPMC07_025

تاریخ نمایه سازی: 14 شهریور 1393

چکیده مقاله:

Abstract-this paper considers a project scheduling problem in which the maximum availability of resources is decision is to determine a mode and a starting time for each activity so that all constraints are obeyed and cost of resorce requirements and tardiness are minimized . all of the precedence relatinships annceling approach is proposed to solve this problem. compulational results have been renorted and the efficiency of the proposed model has been analvzed

کلیدواژه ها:

Keywords-project scheduling ، resource availabitlity cost problem ، simulated annealing

نویسندگان

H Atarodin

Department of industrial engineering, urmia university of technology, urmia, iran

M Sabzehpaevar

Department of industrial engineering, islmic azad university-karaj branch,karaj,iran