Well-timed execution of project activities requires an integrated and effective planning and management in an accurate adjustment of the project activities execution time. Although a lot of works has been done on MRCPSP (multi-resource constrained project scheduling problem) with the goal of minimizing the project makespan, but considering other goals in current projects like the project total cost is also important to the managers. So in this article, a mathematical model has been considered for resource-constrained project scheduling with two objectives: minimizing both project total cost and makespan. And this problem has been solved with a meta-heuristic algorithm called Imperialist Competitive algorithm which has never been used to solve this type of problems. The results have been compared with PSO algorithm in which they are satisfactory

نویسندگان

Sina Namazi

Department of Industrial Engineering, Islamic Azad University, Karaj Branch

Mohammad Reza Zare Fard

Department of Industrial Engineering, Islamic Azad University, Qazvin Branch

Seyed Mohammad Reza Musavi

Department of Industrial Engineering, Islamic Azad University, Karaj Branch

Mohammad Bahrami Nasab

Department of Industrial Engineering, Islamic Azad University, Qazvin Branch