Time Driven ABC as a new approach for allocating costs in the Egyptian manufacturing companies - Case Study
سال انتشار: 1394
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 772
فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
MRMEA01_020
تاریخ نمایه سازی: 30 بهمن 1394
چکیده مقاله:
This research aims to Identifying problems related to the application of Activity Based Costing, and Demonstrating steps of applying Time Driven Activity Based Costing according to the Egyptian manufacturing environment. This paper explores some of the weaknesses of traditional ABC and demonstrates how the new Time-Driven activity-based costing overcomes many of these problems. Through a case study, we show how to perform a time-driven activity-based costing and provide evidence of the benefits of such an analysis. The results indicate that the time-driven activity-based costing is easier and faster to build an accurate model than activity-based costing.
کلیدواژه ها:
نویسندگان
Mohamed Khamis badr
Department of Accounting, Alexandria University,Alexandria, Egypt
abd el chany
department of accounting alexandria university alexandria egytp
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :