Verification of Insulation Coordination Completed by High-Voltage Testing on Site

سال انتشار: 1382
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,669

فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

PSC18_182

تاریخ نمایه سازی: 28 اردیبهشت 1386

چکیده مقاله:

Insulation coordination of substation equipment, cables and power lines is usually verified by type and routine tests in factory. To guarantee the insulation coordination in service it is necessary to demonstrate that insulation of the equipment is without transportation faults and correctly assembled. This is usually done by HV tests on site. The paper informs about the general principles for HV on-site testing as they are prepared by the IEC Working 42.13 for a new part 3 of the IEC Standard 60060. As examples requirements and test equipment for onsite t esting of gas-insulated substations (GIS) and HV XLPE cables are described. Finally the relation between on-site testing before commissioning on the one hand and after repair or for diagnostic purposes are considered.

نویسندگان

Hauschild

HIGHVOLT Prüftechnik Dresden GmbH Germany

Kübler

HIGHVOLT Prüftechnik Dresden GmbH Germany