چکیده مقاله:
Multi Period Multi Production (MPMP) problems are well known in the literature and several researches had been carried out in this area. The MPMP problem including machine order visit has focused by a little researchers since ١٩٩٩. As a result, a hybrid simulation analysis – analytical model developed in ٢٠٠٥. However, most of focused researches had been investigated MPMP through a deterministic situation. Since in operational environments, many risk factors e.g. probabilistic duration, lag time, start and finish of each activity may be happened, in this paper above mentioned factors will be taken into consideration in order to obtain most likely finish time resulting from probabilistic nature of production environment. The approach helps manufacturer to have a better delivery performance to the customer and forecast most likely finish time more precise. Likewise, a planned value for cost control system can be determined.
کلیدواژه ها:
نویسندگان
Morteza Bagherpour
Department of Industrial Engineering, Islamic Azad University, Shiraz, Iran
Siamak Noori
Department of Industrial Engineering, Iran University of Science and echnology, Tehran, Iran
Ehsan Parhizghar
Department of Industrial Engineering, Islamic Azad University, Shiraz, Iran
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :