SALTO CAXIAS - A ROTOR RIM SHRINKING PROBLEM DETECTED BY AIR GAP MONITORING SYSTEM AT COMMISSIONING

عنوان مقاله: SALTO CAXIAS - A ROTOR RIM SHRINKING PROBLEM DETECTED BY AIR GAP MONITORING SYSTEM AT COMMISSIONING
شناسه ملی مقاله: PSC17_132
منتشر شده در هفدهمین کنفرانس بین المللی برق در سال 1381
مشخصات نویسندگان مقاله:

Pedro Massanori Sakuma - COPEL - Companhia Paranaense de Energia Parand - Brazil
Alvaro Jose Noe Fogaga - COPEL - Companhia Paranaense de Energia Parand - Brazil
Orlete Nogarolli - COPEL - Companhia Paranaense de Energia Parand - Brazil

خلاصه مقاله:
This paper describes COPEL's experience using the Air Gap Monitoring System (AGMS) at Salto Caxias Power Plant commissioning. An insufficient rotor rim shrinking was detected on all four units using the system. The repairs and verification using the AGMS saved significant time and costs. The new method should be adopted in the future since it detects problems before the commercial operation of the units. Test results comparison is made before and after corrective action, showing the AGMS ability to detect the problem and to confirm the repair effectiveness.

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/36788/