Generator’s Reactive Power Support to Active Loads in a Pool Model Market
عنوان مقاله: Generator’s Reactive Power Support to Active Loads in a Pool Model Market
شناسه ملی مقاله: PSC19_172
منتشر شده در نوزدهمین کنفرانس بین المللی برق در سال 1383
شناسه ملی مقاله: PSC19_172
منتشر شده در نوزدهمین کنفرانس بین المللی برق در سال 1383
مشخصات نویسندگان مقاله:
Parniani - Sharif University of Technology Tehran, Iran
Maghuli - Sharif University of Technology Tehran, Iran
خلاصه مقاله:
Parniani - Sharif University of Technology Tehran, Iran
Maghuli - Sharif University of Technology Tehran, Iran
The new trend in electricity market considers reactive power as an ancillary service which should be paid for it. Unbundling reactive power support leads to a necessity for an equitable and fair allocation mechanism for this support. The allocation mechanism is a prerequisite for a pricing scheme. In this paper, first the effect of active power delivery on generators’ reactive power output is shown on a test system. Then upon definition of the problem, a simple and yet accurate method is proposed to allocate reactive power generation due to active power of load. Results of a case study using the proposed method are also presented.
کلمات کلیدی: reactive power allocation, active power tracing, ancillary service
صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/20775/