CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Proactive and reactive strategies for project resource levelling

عنوان مقاله: Proactive and reactive strategies for project resource levelling
شناسه ملی مقاله: IPMC07_083
منتشر شده در هفتمین کنفرانس بین المللی مدیریت پروژه در سال 1390
مشخصات نویسندگان مقاله:

M bagheri - islamic azad universigy, science and research branch faculty of engineering, deparment of industrial engineering, tehran,iran
F jolai - university of tehran,college of engineering, deparment of engineering, deparment of industrial engineering, tehran,iran
M.B aryanezhad - iran university of science and technology,deparment of industrial engineering, tehran,iran

خلاصه مقاله:
resource levelling problem considers resource usage pattern in project plan attempts to create a levelled baseline schedule. During execution however, some disruptions may occur activites may take longer or shorter than expected. These disruptions tpgether with reactive decisions bring us to a realized schedule which may not be levelled any more at the and of project. we propose different proactive and reactive strategies in planning and in execution and via an extensive simulation - based analysis evalute effectiveness the strategies. additonally, we show how traditional efforts to construct a levelled baseline might be fruitless in practice.

کلمات کلیدی:
project scheduling, resource levelling, stability, robustness, proactive,reactive

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/287814/