Numerical investigation of the stability of entrance portal at time of TBM arrival into station by FLAC3D

سال انتشار: 1396
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 514

فایل این مقاله در 15 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

ICCACS02_221

تاریخ نمایه سازی: 25 آذر 1396

چکیده مقاله:

In boring of railway tunnels in urban areas with TBM, when boring machine enters the station, special piles (plastic piles) are built at entry of tunnel to the station. These piles don’t have any reinforcing bar and their cement content is 175 kg/m3. In its mixing plan, bentonite (bentonite content=30 kg/m3) is used to more waterproofing in stations which are under the underground water level. Because TBM cannot bore high strength steel and concrete, this kind of concrete is used in piles (plastic piles). Set of the entrance plastic piles which are built in few rows with suitable overlap (20 cm), are named as entrance tampon. These piles will provide stability and small deformation for the soil which is at backside of the tampon and also it will provide stability of entrance tampon when a pressure is applied to the work front by boring machine. In this paper, suitable thickness was obtained for stability of entrance tampon when TBM enters the station by using of numerical analysis. FLAC3D V5.00 is the software that was used for modeling.

کلیدواژه ها:

stability ، Tabriz urban railway line2 ، Entrance tampon ، Plastic pile

نویسندگان

Mohammad Ata Ebrahimi Bakhtavar

Graduate Student, Islamic Azad University, Marand Branch

Javad Ghaffari

Assistant Professor, University of Tabriz