Two-CNC Machine Robotic Cell Scheduling Considering Different Strategies of Robotic Arm Movements

سال انتشار: 1396
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 393

فایل این مقاله در 8 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IIEC14_022

تاریخ نمایه سازی: 26 مرداد 1397

چکیده مقاله:

This study considers a manufacturing robotic cell including two identical CNC machines and a material handling robot. The robotic cell produces a set of parts of the different types that presents a flow-line manufacturing system. Parts which require the completion of a number of operations are to be produced in a cyclic scheduling environment. The sequencing of parts and allocations of the operations to the machines are variable and also the processing time of an operation on a machine can be changed between two upper and lower bounds. The new idea behind this study is considering a bi-criteria model which determines the allocation of the operations to the machines, the sequencing parts to the production cycle, the processing times of the operations on the machines, and the robot move sequence that jointly minimize two objective functions; i.e.; the cycle time and the total manufacturing cost. Mathematical models for the two 1-unit cycles and a genetic algorithm with numerical analysis of the model are provided and the efficiency of the approach in terms of the solution quality is shown. The genetic algorithm proposed in this paper is the second version of the Non-dominated Sorting Genetic Algorithm which is called NSGA-II. Goal programing has also been used in order to handle the multiple objective measures.

نویسندگان

mahdi khaki

Dept‘ of Industrial Eng, University ۰fKurdistrm, Sanandaj, Iran