Crisis Management by Calculating Earned Value

سال انتشار: 1387
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 2,573

فایل این مقاله در 8 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

INRC03_221

تاریخ نمایه سازی: 3 مرداد 1387

چکیده مقاله:

Earthquake is an inevitable reality; therefore, human beings have to get themselves adapted with it. Experience has shown that most of the damages resulted from earthquakes take place after they happen. Fire and various diseases are of short-term damages, and educational gaps or long-lasting mental impressions are of the long-term ones. The main reason for these short-term damages is the lifeline destruction, such as water and recently wastewater networks, during earthquake and/or after it. To avoid these sorts of shortcomings, we are compelled to retrofit the existing networks. Besides, with these progresses in crisis management systems in our country, the necessity of preventive revamping is obvious. This paper aims at retrofitting economical considerations, its earned value, and on the other hand establishing different optimal methods of managing retrofitting projects.

کلیدواژه ها:

نویسندگان

Adel Allafsalehi

BSC in civil engineering Power and Water University of Technology

Maryam Rostami Tejaragh

BA in English language Shahid Rajayi TTC, Isfahan

Hassan Beirami Fam Maleki

BSC in civil engineering Power and Water University of Technology

Ali Akbar Nezamabadi

MSC in Environmental Engineering

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :