Crossing of Fault Zones in the MFS Faido by Using the Observational Method

سال انتشار: 1386
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,857

فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IRMC03_183

تاریخ نمایه سازی: 15 بهمن 1385

چکیده مقاله:

The presentation deals with the crossing of severe fault zones in the multifunctional station Faido (MFS Faido), part of the Gotthard Base Tunnel, located in Switzerland. During the excavation work of the MFS Faido large, not prognosticated fault zones were found. Their impact on the layout and the tunnel support is described. Therefore the excavation procedure and the support system were specified over the combination of geotechnical computations and the observational method. By using both the severe fault zones in the MFS Faido could be crossed successfully.

نویسندگان

Stadelmann

Amberg Engineering Ltd, Switzerland

Wenner

Amberg Engineering Ltd, Switzerland

Wannenmacher

Amberg Engineering Ltd, Switzerland

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Flury, St., Zbinden, P. and Roethli sberger, B. (2005). "Clallenges ...
  • Hoek, E. (2000).، Practical Rock Engineering . PDF available at ...
  • Kovari, K. and Lunardi, P. (2000). 4On the Observational Method ...
  • نمایش کامل مراجع