Investigating Environmental Impact Assessment (EIA) in Early Studies (Zero-Phase) to Prevent Delay in Operation of Construction Projects

سال انتشار: 1397
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 464

فایل این مقاله در 9 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_CEJ-4-1_010

تاریخ نمایه سازی: 6 آذر 1397

چکیده مقاله:

Delay in project execution is one of the outmost problems that lead to delay to operation and subsequently, early structural erosion or financial supply disturbance, etc. Delay is fallen into several categories and each category has its own specific origin. However, in the present paper, environmental factors causing delay to projects are investigated. Delay to Construction Projects operation can be prevented by embedding environmental studies, namely environmental impact assessment (EIA) in initial studies. Given that environmental events cannot be predicted and we can only rely on statistic reports of previous periods, the effect of embedding such assessment in projects is so useful that every manger is convinced to make use of this assessment in study phase. The research results revealed that it is necessary to present EIA in initial studies to prevent delay to Construction Projects operation. In the following, given to the necessity of checklist, the quality of the designed checklist was investigated. Finally, the checklist was implemented and checked. In this study, each of the research questions was separately tested.

کلیدواژه ها:

Environmental Impact Assessment (EIA) ، Construction Project ، Environmental Checklist ، Delay

نویسندگان

Iraj Jalali

Department of Construction Engineering and Management, Yazd Branch, Islamic Azad University, Yazd, Iran

S Mahnammad Poorhashemi

Department of Physics, Yazd Branch, Islamic Azad University, Yazd, Iran

Alireza Mirjalili

Department of Construction Engineering and Management, Yazd Branch, Islamic Azad University, Yazd, Iran