Physical Model Test and Numerical Simulation Study of Deformation Mechanism ofWall Rock on Open Pit to Underground Mining
محل انتشار: ماهنامه بین المللی مهندسی، دوره: 27، شماره: 11
سال انتشار: 1393
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 474
فایل این مقاله در 8 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJE-27-11_018
تاریخ نمایه سازی: 12 آبان 1393
چکیده مقاله:
Based on the engineering background of Daye Iron Mine in Central China`s Hubei Province, thedeformation mechanism and influence area of wall rock in the process of open pit to undergroundmining with high-steep slope was studied using physical model test and numerical simulation. Firstly,the selected typical section of the research was generalized, the physical model built with similarmaterials, special methods used to simulate the mining practice, dial indicators and digital camerameasurement used to monitor the model deformation during the whole mining process. Secondly, thenumerical model was built and the mining practice simulated using numerical simulation software toverify the results of physical model tests. The results indicate that the final failure of wall rocks appearat the areas nearing the ore body and does not have great influence on the stability of undergroundslope, the wall rock displacements of model increase slowly with increasing the mining depth. Thedisplacements change laws of rocks nearing the faults are the same as other rocks at the same depth;the results of physical model test are generally in agreement with the numerical simulation
کلیدواژه ها:
Physical Model TestNumerical SimulationDeformation MechanismWall RockOpen-pit to Underground Mining
نویسندگان
z Ding-bang
School of Civil Engineering, Hubei Polytechnic University, Huangshi-۴۳۵۰۰۳, China
z Chuan-bo
Faculty of Engineering, China University of Geosciences, Wuhan-۴۳۰۰۷۴, China
l Yang-bo
Faculty of Engineering, China University of Geosciences, Wuhan-۴۳۰۰۷۴, China
y Jian-yi
School of Civil Engineering, Hubei Polytechnic University, Huangshi-۴۳۵۰۰۳, China