A New Developed Model to Determine Waste Dump Site Selection in Open Pit Mines: An Approach to Minimize Haul Road Construction Cost

سال انتشار: 1399
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 388

فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_IJE-33-7_029

تاریخ نمایه سازی: 4 شهریور 1399

چکیده مقاله:

Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displaced by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main waste dump site will be used as a disposal of waste dump. Apart from considering the characteristics of the waste dump location such as geological and geotechnical properties, the major factors influencing the hauling process are topography, hauling length and construction cost of the haul road. Truck transportation cost depending on the circumstances comprises 45 to 60% of the cost of mining of one tonne ore. Thus, well site selection of waste dump in coordination with the main haul road path confidently leads to a significant saving of economic resources. In this research, while identifying the effective factors in selecting the waste dump sites, a linear mathematical model is developed to find a suitable site for waste dump disposal considering minimizing haul road construction cost.

نویسندگان

A. Hajarian

Department of Mining and Metallurgical Engineering, Amirkabir University of Technology, Tehran, Iran

M. Osanloo

Department of Mining and Metallurgical Engineering, Amirkabir University of Technology, Tehran, Iran