On the Optimal Frequency and Timing of Control Points in a Projects Life Cycle

سال انتشار: 1388
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 506

فایل این مقاله در 7 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_IJIEPR-20-3_002

تاریخ نمایه سازی: 7 شهریور 1393

چکیده مقاله:

The dynamic nature of projects and the fact that they are carried out in changing environments, justify the need for their periodic monitoring and control. Collection of information about the performance of projects at control points costs money. The corrective actions that may need to be taken to bring the project in line with the plan also costs money. On the other hand, penalties are usually imposed when due to no monitoring policies projects are delivered later than expected. Thence, this paper addresses two fundamental questions in this regard. First question concerns the optimal frequency of control during the life cycle of a project. The second question concerns the optimal timing of control points. Our solution methodology consists of a simulationoptimizationmodel that optimizes the timing of control points using the attraction-repulsion mechanisms borrowed from the electromagnetism theory A mathematical model is also used to optimally expedite the remaining part of the project when possible delays are to be compensated.

نویسندگان

Hamed. R. Tareghian

is with the Department of Applied Mathematics, Faculty of Mathematical Sciences, Ferdowsi University of Mashhad.

Madjid. Salari

is with the Department of Applied Mathematics, Faculty of Mathematical Sciences, Ferdowsi University of Mashhad