An Improved WAGNER-WHITIN Algorithm

سال انتشار: 1388
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 603

فایل این مقاله در 7 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_IJIEPR-20-3_005

تاریخ نمایه سازی: 7 شهریور 1393

چکیده مقاله:

We present an improved implementation of the Wagner-Whitin algorithm for economic lot-sizing problems based on the planninghorizon theorem and the Economic- Part-Period concept. The proposed method of this paper reduces the burden of the computations significantly in two different cases. We first assume there is no backlogging and inventory holding and set-up costs are fixed. The second model of this paper considers WWA when backlogging,inventory holding and set-up costs cannot be fixed. The preliminary results also indicate that the execution time for the proposed method is approximately linear in the number of periods in the planning-horizon.

نویسندگان

S.J. Sadjadi

Department of Industrial Engineering, Iran University of Science and Technology.Corssponding

Mir.B.Gh. Aryanezhad

Department of Industrial Engineering, Iran University of Science and Technology.Corssponding

H.A. Sadeghi

Department of Industrial Engineering Kurdistan University