Project Performance Improvement through the Earned Value Management System

سال انتشار: 1395
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 823

فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

MOCONF05_149

تاریخ نمایه سازی: 21 شهریور 1395

چکیده مقاله:

Earned Value Management is a methodology for determining the cost, technical, and schedule performances of a complex program or project by comparing work that is planned with work that is accomplished in terms of the dollar value assigned to the work. In this paper we propose two new metrics that combine Earned Value Management (EVM) and Project Risk Management for project controlling and monitoring. We compare EVM cost and schedule variances with the deviation the project should have under the risk analysis expected conditions.These two indexes allow project managers to analyse whether the project over-runs are within expected variability or there are structural and systemic changes over the project life cycle. The new monitoring indexes we present are the Cost Control Index and the Schedule Control Index

نویسندگان

Mohammad Ebrahim Ebrahimi Malekshah

Hormoz Urea Fertilizer Co., Planning Director, Tehran, Iran

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Anbari, F.T., 2003. Earned value project management method and extensions. ...
  • Byung-cheol, K., Reinschmidt, F., 2009. Probabilistic forecasting of project duration ...
  • Cagno, E., Caron, F., Mancini, M., 2007. A multi -dimensional ...
  • Cagno, E., Caron, F., Mancini, M., 2008. Dynamic analysis of ...
  • International Journal of Risk Assessment and Management 10 (1-2), 70-87. ...
  • Christensen, D.S., 1998. The costs and benefits of the earned ...
  • Christensen, D.S., Templin, C., 2002. EAC evaluation methods: do they ...
  • Fleming, Q.W., Koppelman, J.M., 2005. Earned Value Project Management, 3rd ...
  • Lipke, W., 2003. Schedule is different. Measurable News, Summer, pp. ...
  • Lipke, W., Zwikael, O., Henderson, K., Anbari, F., 2009. Prediction ...
  • Morin, J., 2009. How it all began. The creation of ...
  • Project Management Institute (PMI), 2005. Practice Standard for Earned Value ...
  • US Navy, 1958a. Program evaluation research task, summary report phase ...
  • US Navy, 1958b. Program evaluation research task, summary report phase ...
  • Vandevoorde, S., Vanhoucke, M., 2006. A comparison of different project ...
  • Vandevoorde, S., Vanloucke, M., 2007. A simulation and evaluation of ...
  • Williams, T.M., 2005. Assessing and moving on from the dominant ...
  • Williams, T.M., 2002. Modelling Complex Projects. Jon Willey & Sons, ...
  • Williams, T.M., 1993. What s critical? International Journal of Project ...
  • Williams, T.M., 1992. Criticality in probabilistic network analysis. Journal of ...
  • Zwikael, O., Globerson, S., Raz, T., 2000. Evaluation of models ...
  • نمایش کامل مراجع