Earned Value Management is a methodology for determining the cost, technical, and schedule performances of a complex program or project by comparing work that is planned with work that is accomplished in terms of the dollar value assigned to the work. In this paper we propose two new metrics that combine Earned Value Management (EVM) and Project Risk Management for project controlling and monitoring. We compare EVM cost and schedule variances with the deviation the project should have under the risk analysis expected conditions.These two indexes allow project managers to analyse whether the project over-runs are within expected variability or there are structural and systemic changes over the project life cycle. The new monitoring indexes we present are the Cost Control Index and the Schedule Control Index
کلیدواژه ها:
نویسندگان
Mohammad Ebrahim Ebrahimi Malekshah
Hormoz Urea Fertilizer Co., Planning Director, Tehran, Iran
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :