First Filling of a Dam Reservoir: Case of Beris Dam Malaysia

سال انتشار: 1390
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 2,203

فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

NCHP03_695

تاریخ نمایه سازی: 3 فروردین 1391

چکیده مقاله:

The first filling of Beris dam reservoir was done in a systematic manner. A procedure manual was prepared for the purpose which covered plans for water control, prefillinginspections, project surveillance, contingency and safety, and issues of public affairs, transportation and communications. It took 10 months to fill reservoir to itsnormal pool level. During that time the dam and appurtenant structures were regular ly inspected and all instrument readings were monitored. At the end of filling ateam of experts inspected the project works and interpreted all instrument records to assess safe and satisfactory performance of the project works

کلیدواژه ها:

نویسندگان

M. IBRAHIM SAMOON

Dams Engineer ACE Pakistan, a member of the team design, supervision and monitoring of Beris dam Project, Malaysia

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • WM K-ACE-CTI : Beris Dam Procedure Manual for First Reservoir ...
  • USACE: Initial Reservoir Filling Plan, ETL 1110-2-231, Army Corps of ...
  • نمایش کامل مراجع