SALTO CAXIAS - A ROTOR RIM SHRINKING PROBLEM DETECTED BY AIR GAP MONITORING SYSTEM AT COMMISSIONING

سال انتشار: 1381
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,755

فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

PSC17_132

تاریخ نمایه سازی: 8 مهر 1386

چکیده مقاله:

This paper describes COPEL's experience using the Air Gap Monitoring System (AGMS) at Salto Caxias Power Plant commissioning. An insufficient rotor rim shrinking was detected on all four units using the system. The repairs and verification using the AGMS saved significant time and costs. The new method should be adopted in the future since it detects problems before the commercial operation of the units. Test results comparison is made before and after corrective action, showing the AGMS ability to detect the problem and to confirm the repair effectiveness.

نویسندگان

Pedro Massanori Sakuma

COPEL - Companhia Paranaense de Energia Parand - Brazil

Alvaro Jose Noe Fogaga

COPEL - Companhia Paranaense de Energia Parand - Brazil

Orlete Nogarolli

COPEL - Companhia Paranaense de Energia Parand - Brazil