CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Analysis on Components Complexity During Execution of Construction Projects

عنوان مقاله: Analysis on Components Complexity During Execution of Construction Projects
شناسه ملی مقاله: JR_IJE-29-9_007
منتشر شده در شماره 9 دوره 29 فصل September در سال 1395
مشخصات نویسندگان مقاله:

N.V Achuth Kumar - Department of Civil Engineering, KL University, Andhra Pradesh, India
S.S Bhanu Prakash - Department of Civil Engineering, KL University, Andhra Pradesh, India

خلاصه مقاله:
Development is the fundamental area in enabling India`s economy and urban and provincial structure. Development is a multi-connected structure where all variables are bury connected and multi-centered. All the three limitations time, expense and quality ought to be adjusted in an improved way, so that no segment gets influenced by dismissing those. The goal of this study is to distinguish the managerial variables which will prompt limitations which let-down the development concerning cost, time and quality parts of development from five segments which are critical in execution of development venture. A sum of 51 managerial variables is considered from five components specifically material, labor, equipment, quality control and safety. Data validation is completed for 51 calculated managerial factors. Results revealed that Cronbach coefficient value for all components in three constraints are with range of 0.8-0.9 which is considered as highly reliable with assumed scale. Relative significance is done on these factors. The obtained results reveal that value acceleration of material is 1st most variable with 0.85 RII esteem, which would be a basic element prompting limitation and may let-down the development. Truancy of work with 0.866 RII esteem as far as time limitation, low material quality observing framework with 0.903 regarding quality requirement and afterward relationship examination is finished with variables harmonizing the three imperatives. The result revealed that work efficiency is critical among all components which is associated with 19 different elements above moderate scale. Any need and impact on these elements will demonstrate way on different perspectives which may prompt requirement that let-down the development venture.

کلمات کلیدی:
Construction ManagementCost ConstraintTime ConstraintQuality ConstraintCorrelation

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/542465/