An optimal model for Project Risk Response Portfolio Selection (P۲RPS) (Case study: Research institute of petroleum industry)

سال انتشار: 1395
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 189

فایل این مقاله در 25 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_JIJMS-9-4_003

تاریخ نمایه سازی: 23 شهریور 1401

چکیده مقاله:

In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structure breakdown, risk occurrences, risk reduction measures, and their effects are clearly related to each other, is proposed to evaluate and select the project risk responses. The model aims at optimization of defined criteria (objectives) of the project. Unlike similar previous studies, in this study, the relationship between risk responses during implementation has been considered. The model is capable of considering and optimizing different criteria in the objective function depending on the kind of project. In addition, a case study related to petroleum projects is presented, and the corresponding figures are analyzed.

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Ben-David, I., & Raz, T. (۲۰۰۱). An integrated approach for ...
  • Ben-David, I., Rabinowitz, G. & Raz, T. (۲۰۰۲). Economic optimization ...
  • Boehm, B. W. (۱۹۹۱). Software risk management: Principles and practices. ...
  • Chapman, C., & Ward, S. (۲۰۰۳). Project risk management: Processes, ...
  • Chapman, C. B. (۱۹۷۹). Large engineering project risk analysis. IEEE ...
  • Conrow, E. H. (۲۰۰۳). Effective risk management: Some keys to ...
  • Cooper, D. F. (۲۰۰۵). Project risk management guidelines: Managing risk ...
  • Datta, S., & Mukherjee, S. K. (۲۰۰۱). Developing a risk ...
  • Dikmen, I., Birgonul, M. T., Anac, C., Tah, J. H. ...
  • Elkjaer, M., & Felding, F. (۱۹۹۹). Applied project risk management-introducing ...
  • Fan, Z. P., Li, Y. H., & Zhang, Y. (۲۰۱۵). ...
  • Fan, M., Lin, N. P., & Sheu, C. (۲۰۰۸). Choosing ...
  • Fang, C., & Marle, F. (۲۰۱۲). A simulation-based risk network ...
  • Flanagan, R., & Norman, G. (۱۹۹۳). Risk management and construction. ...
  • Guide, A. (۲۰۰۱). Project Management Body of Knowledge (PMBOK® GUIDE). ...
  • Haimes, Y. (۲۰۰۵). Risk modeling, assessment, and management. ۲nd edition, ...
  • Hillson, D. (۱۹۹۹, October). Developing effective risk responses. In Proceedings ...
  • Hillson, D. (۲۰۰۱, November). Effective strategies for exploiting opportunities. In ...
  • Kayis, B., Arndt, G., Zhou, M., & Amornsawadwatana, S. (۲۰۰۷). ...
  • Klein, J. H. (۱۹۹۳). Modelling risk trade-off. Journal of the ...
  • Klein, J. H., Powell, P. L., & Chapman, C. B. ...
  • Kujawski, E. (۲۰۰۲). Selection of technical risk responses for efficient ...
  • López, C., & Salmeron, J. L. (۲۰۱۲). Risks response strategies ...
  • Lyons, T., & Skitmore, M. (۲۰۰۴). Project risk management in ...
  • Mavrotas, G. (۲۰۰۹). Effective implementation of the ε-constraint method in ...
  • Miller, R., & Lessard, D. (۲۰۰۱). Understanding and managing risks ...
  • Pipattanapiwong, J., & Watanabe, T. (۲۰۰۰). Multi-party Risk Management Process ...
  • Piney, C. (۲۰۰۲). Risk response planning: Select the right strategy. ...
  • Seyedhoseini, S. M., Noori, S., & Hatefi, M. A. (۲۰۰۹). ...
  • Zhang, Y., & Fan, Z. P. (۲۰۱۴). An optimization method ...
  • نمایش کامل مراجع