The interval type-۲ fuzzy ELECTRE III method to prioritize machines for preventive maintenance

سال انتشار: 1400
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 233

فایل این مقاله در 19 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_IJIEPR-32-4_001

تاریخ نمایه سازی: 19 دی 1400

چکیده مقاله:

Preventive maintenance (PM) of machines has the critical role in a factory or enterprise. It decreases number of failures, increases reliability, as well as minimizes costs of production systems.  The managers’ duty of maintenance section is to prioritize machines and then, implement PM programs for them. Since machines have the different measures with respect to the maintenance costs, reliability, mean time between failures (MTBF), availability of spare parts, etc., the machines evaluation problem can be considered as a multiple criteria decision-making (MCDM) problem. Accordingly, the MCDM techniques can be applied to solve them. The aim of this paper is to extend the ELECTRE III (eLimination et choix traduisant la realite´– elimination and choice translation reality) method to interval type-۲ fuzzy sets (IT۲FSs) using curved (such as Gaussian) membership functions (MFs). The extended ELECTRE III methodology is then utilized to a maintenance group MCDM (GMCDM) matrix including the quantitative and qualitative criteria. In the proposed approach, the criteria weights, the assessment of alternatives with respect to criteria, and the thresholds are stated with Gaussian interval type-۲ fuzzy sets (GIT۲FSs). In order to show the effectiveness and applicability of the proposed approach, a case study and an illustrative example are exhibited using real decision-making problems. Due to the high correlation coefficients between our method and the others, as well as the results obtained by the proposed method, it can be taken into account as a valid and reliable approach to prioritize machines for PM.

کلیدواژه ها:

ELECTRE III ، Gaussian interval type-۲ fuzzy sets ، Alpha cuts ، Preventive maintenance

نویسندگان

Amir Mohamadghasemi

Department of Management, Zabol Branch, Islamic Azad University, Zabol, Iran

Abdollah Hadi-vencheh

Department of Mathematics, Isfahan (Khorasgan) Branch, Islamic Azad University, Isfahan, Iran

Farhad hosseinzadeh lotfi

Department of Mathematics, Science and Research Branch, Islamic Azad University, Tehran, Iran