Estimation of the Physical Progress of Work Using UAV and BIM in Construction Projects

سال انتشار: 1403
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 45

فایل این مقاله در 22 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_CEJ-10-2_002

تاریخ نمایه سازی: 2 اردیبهشت 1403

چکیده مقاله:

The delay in the physical progress of construction creates additional costs, missed deadlines, and quality issues. The research aimed to estimate the physical progress of the project by using unmanned aerial vehicles (UAVs) and building information modeling (BIM). The methodology comprised capturing ۸۴۸ high-resolution images of the Civil Engineering Laboratory construction site at the National University of Jaen, Cajamarca, Peru, using the Phantom ۴ RTK drone. The photographs were processed using Agisoft ۲.۰.۱ software, resulting in a point cloud. This was then imported into ReCap Pro ۲۰۲۳ software, which was used to assess the quality of the points. The Revit ۲۰۲۳ software was subsequently utilized to establish the phase parameters, linking the BIM model with the point cloud, filtering the model, and eventually exporting it to the Power BI ۲۰۲۳ software. The work's estimated progress utilizing the proposed methodology was ۴۲.۸۲%, which was not statistically significant compared to the Public Works Information System (INFOBRAS) of ۴۳.۱۴%. This allows for the automation of customary processes, the identification of crucial issues, and prompt decision-making. The study's originality lies in the suggestion of integrating aerial imagery with drones and BIM modeling for the real-time and precise estimation of work progression. This method provides a precise and effective substitute for traditional techniques for gauging the tangible advancement of projects. Doi: ۱۰.۲۸۹۹۱/CEJ-۲۰۲۴-۰۱۰-۰۲-۰۲ Full Text: PDF

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Fonseca Arenas, N., & Shafique, M. (2023). Recent progress on ...
  • Awed, A. M., Maher, A., Abozied, M. A. H., & ...
  • Jiang, W., Zhou, Y., Ding, L., Zhou, C., & Ning, ...
  • Li, F., Laili, Y., Chen, X., Lou, Y., Wang, C., ...
  • Elkhapery, B., Pěnička, R., Němec, M., & Siddiqui, M. (2023). ...
  • Pan, Y., & Zhang, L. (2021). Automated process discovery from ...
  • Alizadehsalehi, S., & Yitmen, I. (2016). The Impact of Field ...
  • Song, C., Chen, Z., Wang, K., Luo, H., & Cheng, ...
  • Siebert, S., & Teizer, J. (2014). Mobile 3D mapping for ...
  • Mourtzis, D., Angelopoulos, J., & Panopoulos, N. (2022). Unmanned Aerial ...
  • Matlekovic, L., Juric, F., & Schneider-Kamp, P. (2022). Microservices for ...
  • Alam, M. M., & Moh, S. (2022). Joint topology control ...
  • Nwaogu, J. M., Yang, Y., Chan, A. P. C., & ...
  • Zhang, J., Xu, S., Zhao, Y., Sun, J., Xu, S., ...
  • Chen, Q., Chen, J., & Huang, W. (2022). Pathfinding method ...
  • Meyer, T., Brunn, A., & Stilla, U. (2023). Geometric BIM ...
  • Meyer, T., Brunn, A., & Stilla, U. (2022). Change detection ...
  • Reja, V. K., Varghese, K., & Ha, Q. P. (2022). ...
  • Sheikhkhoshkar, M., Pour Rahimian, F., Kaveh, M. H., Hosseini, M. ...
  • Abuaddous, M., Al-Btoosh, J. A. A., Al-Btoush, M. A. K. ...
  • Kiriiak, N. (2021). Development and implementation of technical decision for ...
  • Melo, R. R. S. de, Costa, D. B., Álvares, J. ...
  • Ellenberg, A., Kontsos, A., Moon, F., & Bartoli, I. (2016). ...
  • Huang, H., Long, J., Lin, H., Zhang, L., Yi, W., ...
  • Rengaraju, P., Pandian, S. R., & Lung, C.-H. (2014). Communication ...
  • Jones, D. I. (2007, June). An experimental power pick-up mechanism ...
  • Wei, W., Lu, Y., Lin, Y., Bai, R., Zhang, Y., ...
  • Kamari, M., & Ham, Y. (2022). AI-based risk assessment for ...
  • Zhang, C., Wang, F., Zou, Y., Dimyadi, J., Guo, B. ...
  • Jia, S., Liu, C., Guan, X., Wu, H., Zeng, D., ...
  • Han, K. K., Cline, D., & Golparvar-Fard, M. (2015). Formalized ...
  • Dupont, Q. F. M., Chua, D. K. H., Tashrif, A., ...
  • Sampaio, A. Z. (2023). BIM training course improving skills of ...
  • Mohammad El-Basioni, B. M., & Abd El-Kader, S. M. (2023). ...
  • Jain, G., Yadav, G., Prakash, D., Shukla, A., & Tiwari, ...
  • Bori, M. M., & Hussein, Z. E. (2020). Integration the ...
  • Ham, Y., Han, K. K., Lin, J. J., & Golparvar-Fard, ...
  • Han, Y., Feng, D., Wu, W., Yu, X., Wu, G., ...
  • Tan, Y., Li, G., Cai, R., Ma, J., & Wang, ...
  • Jeelani, I., & Gheisari, M. (2021). Safety challenges of UAV ...
  • Pour Rahimian, F., Seyedzadeh, S., Oliver, S., Rodriguez, S., & ...
  • Freimuth, H., & König, M. (2018). Planning and executing construction ...
  • نمایش کامل مراجع