Monitoring and Change Point Estimation of AR(1) Autocorrelated Polynomial Profiles
محل انتشار: ماهنامه بین المللی مهندسی، دوره: 26، شماره: 9
سال انتشار: 1392
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 810
فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJE-26-9_002
تاریخ نمایه سازی: 17 خرداد 1393
چکیده مقاله:
In this paper, a remedial measure is first proposed to eliminate the effect of autocorrelation in phase ІІ monitoring of autocorrelated polynomial profiles, where there is a first order autoregressive (AR(1))relation between the error terms in each profile. Then, a control chart based on the generalized lineartest (GLT) is proposed to monitor the coefficients of polynomial profiles and an R-chart is used to monitor the error variance, the combination of which is called GLT/R chart. The performance of the proposed GLT/R chart is evaluated by comparing it to those obtained from prevalent methodsincluding multivariate T2, EWMA/R and T2 residual control charts, in terms of the average run length (ARL) criterion. Furthermore, an estimator based on the likelihood ratio approach is proposed to estimate the change point in the parameters of autocorrelated polynomial profiles. The results ofextensive simulation experiments show good performance of the proposed estimator. Finally, the applicability of the proposed method is illustrated using a real data example
کلیدواژه ها:
Polynomial Profiles ، Phase ІІ Monitoring ، Autocorrelation ، Average Run Length (ARL) ، General Linear Test (GLT) ، Change Point
نویسندگان
m Keramatpour
Young Researchers and Elite Club, Qazvin Branch, Islamic Azad University, Qazvin, Iran
s.t.a niaki
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
m Khedmati
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
m.e Soleymanian
Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran